SECOND STAGE OF CONSTRUCTION OF THE INDUSTRIAL PARK "KURGAN ENERGOMASH" WAS OPENED

29.05.23

On May 26, 2023, “Kurgan Energomash” Industrial Park, where the TEMPER plant is located, launched the second phase of construction.

The corresponding opening event was attended by the Governor of the Kurgan Region Vadim Shumkov, Director of LLC “Kurganenergomash”, and General Director of LLC “TEMPER” Sergey Doronin. They attached a symbolic tablet to the first driven pile in the construction site.

The first part of the park, opened a year ago, currently hosts 7 import-substituting enterprises and has created more than 160 new jobs.

During the second phase, 8.1-hectare site will be used for the construction of engineering and transportation infrastructure and the equipment of land plots for independent development by new residents. In 2023-2024, two workshops with a total area of 1,500 square meters will be built. The government will allocate funding for the purchase of new technical facilities for the companies located at the constructed objects. In 2025-2026, another 3 hectares of land will be developed.

In general, “Kurgan Energomash” Industrial Park project includes 13.5 thousand square meters of production space located on a land plot of 12.4 hectares. The total cost of the project is RUB 269 mln.